Location
Ibadan/Ilorin
Year
2015
Team
14 field specialists
Client
Power Holding Company of Nigeria
Project Overview
A comprehensive GIS-based inventory and mapping project of the Power Holding Company of Nigeria (PHCN) electrical network infrastructure across Ibadan and Ilorin. The project created a detailed asset inventory enabling efficient network management and maintenance.
Strategic Objectives
Create complete electrical network inventory
Map all poles, transformers, and equipment
Document infrastructure specifications
Enable efficient asset management
Support maintenance planning and operations
Methodology & Process
Extensive field surveys with GPS positioning
Infrastructure identification and classification
Equipment specification documentation
Database development and integration
Training on GIS system usage
Key Outcomes
Complete network map covering both cities
Inventory of 10,000+ poles and transformers
Enabled 25% improvement in maintenance efficiency
Reduced network downtime by 15%
Improved asset tracking and management
Need a similar solution?
Start Your ProjectContinue Exploring

Environmental Sensitivity Index (ESI) Mapping
ESI mapping to determine the vulnerability of nearby environment to existing oil facilities in the Alakiri area.

Land Use Mapping and Resource Assessments
Satellite imagery analysis to measure the quantity and quality of habitats in a regional survey of the Niger Delta.

Bathymetric Analysis
Satellite imagery used to determine the bathymetric profile of the Imo River mouth to support pipeline engineering planning.